Confirm Why Replacement Is Needed
Separate broken distribution components from an unsuitable or exhausted field. The recommendation should explain the evidence.
Check the Tank Too
A field-only project is different from full-system replacement. Review the tank’s condition, capacity and compatibility with the approved design.
Find Suitable Space
The replacement area needs suitable soil and required separation from water, structures and other constraints. Protect it from traffic and grading.
Obtain the Approved Layout
Knox County may need soil mapping, a site plan and an appropriate design. A larger tank alone cannot fix an inadequate treatment area.
Complete Inspection and Records
Schedule the required county inspection before covering work. Keep the final layout and maintain any pumps or treatment equipment as specified.
